Friday, May 24, 2013

Progress - Day 46

Today we had several different craftsmen here!  The trim carpenters returned and finished the fireplace, the molding on the drop ceiling over the bar and the skins on the back of the cabinet by the eating area and the refrigerator along with several other items!  The plumber installed the kitchen faucet and the garbage disposal so now we have access to water on the main level!  The flooring installers returned to install the transition pieces where the tile and the hardwood meet.  Scott brought the microwave and dishwasher so they can be installed next week.  The dust is ALMOST done so I have started filling cupboards!

Today's pictures:


The skin on the back of the cabinet was installed.


Skin on the side of the cabinet next to the refrigerator.


Crown mold on the drop over the bar.


Another view of the crown mold on the drop over the bar.


And a different view!


The trim at the top of the shelf areas was finished.


Hand rail for stairway was put together, now just needs to be stained.


As soon as the railing is done it can be installed!

They put on the handles for the bathroom vanity.



Getting ready for the spindles!


Trim piece under the bar top.  


It goes all the way around!


Kitchen faucet.


Garbage disposal - isn't it lovely?!?


Trim at top of basement stairs.
This matches the rest of the hardware!


Floor transition from family room to kitchen.


Floor transition from hallway to living room.


And last but not least the transition from the living room to the eating area of the kitchen.

Next week - nearing the end!