The electrical work is done (for now!).   Looks like they cleaned up a bit and are getting ready to install the drywall.  The insulation in in the outside walls has to be completed before they start the drywall (that is my professional opinion anyway!).  

Today's pictures (again, compliments of Tim):


Wall between kitchen and living room.
Floor markings identify location of specific items once dry wall is in place.
Orange identifies wall studs and the blue arrows identify ductwork.


More floor markings in the new bathroom.  
The P is where plumbing is located.


Four can lights in the family room.  
The light bulb in the middle will be replaced with a ceiling fan without a light.